Back to Squawk list
  • 2

Flawed concrete found on Detroit Metro Airport runway

送信時刻:
 
The $225-million runway that Detroit Metro Airport added in 2001 was expected to last for 30 years, but cracks and flaws in the concrete that started to show just three years after it opened have posed risks to safety and are forcing a costly reconstruction. Airports in Colorado and Nebraska have experienced similar runway issues with the problem known as alkali/silica reaction, or ASR, which causes concrete to expand and crack when exposed to moisture over time. (www.freep.com) さらに...

Sort type: [Top] [Newest]


preacher1
Good old EPA
tyketto
What does the EPA have to do with this? Reading the article, alkalai/silica reaction (ASR) is responsible for this, and the contractor who won the bid for constructing the runway at KDTW cut costs by trying to mix in sand and gravel. They are responsible for this; incidentally, they are now defunct.
preacher1
He did for a fact and a what you are saying is correct but in the story itself,
"The cement manufacturing industry has increasingly been under pressure to reduce their levels of harmful emissions into the atmosphere," according to an e-mail from MDOT spokesman Jeff Cranson. "This prompted them to modify their manufacturing process to incorporate a portion of the highly alkaline cement kiln dust back into their final product." Not the EPA all together but they definitely had their hand in it.

ログイン

アカウントをお持ちではありませんか? 今すぐ登録(無料)!機能やフライトアラート、その他様々な設定をカスタマイズできます!
FlightAwareのフライト追跡は広告によりサポートされていることをご存知ですか?
広告表示を許可してくださることでFlightAware.comを無料で提供することができます。表示される広告は関連性の高い控えめなものを選んでいます。FlightAwareをホワイトリストに追加する方法はかんたんに設定していただくことができます。または、プレミアムアカウントのご利用をご検討ください.
閉じる